MICAP requisitions chased by phone
A grounded platform waits while someone checks stock, the repair pipeline and lateral sources across systems that each hold part of the answer.
IndustriesDefense sustainment
Work orders, parts demand and technical records live in systems that never talk. 009 agents reconcile them inside your classified network.
Your systems
Backlog
Availability is decided in the maintenance bay and the supply office. These are the queues where your fleet loses days.
A grounded platform waits while someone checks stock, the repair pipeline and lateral sources across systems that each hold part of the answer.
Faults land in the EAM queue and get assigned by whoever knows the bays, with no view of trade skills, current load or the right IETM task.
Parts moved between airframes or vehicles leave configuration records drifting from what is actually installed. Audits find the gap months later.
Your staff assemble NMC and availability reports from weekly exports, so the picture is already stale when command reads it.
One workflow
A fault report lands on a platform already flagged NMC. The Work Order Router prepares the job before your supervisor assigns it.
A crew chief logs a fault against the platform with its tail or hull number.
MaximoThe agent reads the as-maintained configuration and open deferred defects for that platform.
Configuration DBIt matches the applicable IETM task, the required trade and the parts list, then checks stock for each NSN.
IETMYour bay supervisor sees the prepared work order with bay, trade and parts status, then approves or reassigns.
Approval gateIf a part is short, the agent drafts the MICAP requisition for supply to release. Every step is logged.
Supply MISAgent roster
Each agent works inside the access scopes your security authority issues and stops at the gate you set.
Browse all agent typesCompiles availability and NMC status per platform from maintenance and supply records, with each grounding attributed to its cause.
Assigns incoming faults to bay and trade against skill and load, with the matching IETM task and parts status attached.
Projects parts demand from the maintenance plan and fault history so supply can position stock before a MICAP is raised.
Checks each work order against the current IETM revision and flags tasks that cite superseded procedures.
Records every CANN action, keeps the configuration record in step and tracks the backfill requisition until it closes.
Compares as-designed against as-maintained records per platform and builds the discrepancy list ahead of your next audit.
Governance
Agents prepare and propose. Your people approve at the gates you set, and the whole system runs inside your own perimeter.
You decide which actions need a human sign-off, and who gives it.
Each action is logged with the record it read and the rule it applied.
Reverse an agent action from the Command Center when a reviewer disagrees.
Stop one agent or every agent at once, from one screen.
Yes. On-premises and fully air-gapped deployments are standard. Models run inside your infrastructure and updates follow your controlled transfer process. Your security authority sets the accreditation route during Readiness.
Clearance requirements, access rules and escort arrangements are agreed with your security organization in the Readiness week, before any system access exists. Recon itself is read-only.
Every agent action records what it read, the rule it applied and a timestamp. The log exports to your own audit systems, and the agent registry gives inspectors a full inventory of what runs and what it may touch.
Marked data stays in the systems and enclaves where it already lives. Agents read only within the scopes your security authority issues, and the registry records which sources each agent touches.
Thirty minutes with our team. We will walk through the air-gapped deployment path and what your security authority signs off in week one.