Settle delay attribution before the dispute starts.

Possessions, exam cycles and delay minutes are managed across Maximo, planning tools and spreadsheets. 009 agents keep each queue current.

  • Runs inside your network
  • Read-only Recon first
  • Every action gated and logged

Your systems

Systems we work inside

  • Maximo
  • Possession planner
  • Timetable system
  • Performance system
  • Depot management
  • IFS
  • Fleet data feeds
  • Outlook
  • Excel
Possession
Engineering access block on the line
Diagram
Daily rolling stock plan
Delay attribution
Cause and responsibility coding
PPM
Public performance measure
Exam
Scheduled fleet maintenance check
Performance regime
Contractual delay accounting

Backlog

Where your backlog builds up.

Your network runs on a plan that changes every hour. The records behind it fall behind, and these are the queues where it shows.

01

Possession conflicts found late

Overlapping access requests and missing protections surface late in the planning cycle, when the only fix left is to cancel the work.

02

Delay minutes coded in a backlog

Incidents wait for attribution while minutes pile up, and every miscoded delay becomes an argument under the performance regime.

03

Exams planned against an old diagram

Fleet exams slip when depot plans and rolling stock diagrams change, and units run close to their exam limit.

04

Defects triaged by whoever is on shift

Defect reports from drivers and depots arrive in free text, so their priority depends on who happens to read them first.

One workflow

How an agent codes a delay incident.

A train runs late after a signal failure. The Delay Attribution Agent prepares the incident before your performance team agrees the cause.

  1. 01

    Delay recorded

    The performance system logs delay minutes against a service and location.

    Performance system
  2. 02

    Evidence gathered

    The agent reads the asset fault log, control log entries and any open possession on the section.

    Maximo
  3. 03

    Cause proposed

    It proposes a cause code and responsible party, with the evidence and contract clause attached.

    Attribution
  4. 04

    Team agrees

    Your performance team confirms or changes the attribution before it goes to other operators.

    Approval gate
  5. 05

    Filed

    The decision and its evidence are stored, so any later dispute starts from the same file.

    Audit trail

Agent roster

The agents that work your queue.

Agents work the planning and maintenance records around your railway. Signalling and train control stay out of scope.

Browse all agent types
01 Agent

Possession Conflict Checker

Checks each possession request against overlapping work, protection arrangements and the timetable, and flags conflicts early.

Reads
Possession planner, timetable system
Gate
Access planner approves
02 Agent

Delay Attribution Agent

Proposes cause and responsibility for each delay incident with evidence from asset, control and possession records.

Reads
Performance system, Maximo, control logs
Gate
Performance team agrees
03 Agent

Exam Planner

Schedules fleet exams against mileage or time limits, depot capacity and the current diagram.

Reads
Maximo or IFS, depot management
Gate
Fleet engineer releases
04 Agent

Fleet Availability Forecaster

Projects units available per day from open defects, exams and parts status, so diagrams can be covered.

Reads
Maximo, depot management
Gate
Read and report only
05 Agent

Defect Triage Agent

Reads free-text defect reports, assigns codes and priority, and raises the work order with the right depot.

Reads
Defect reports, Maximo
Gate
Depot controller confirms
06 Agent

Handover Compiler

Builds the shift handover from incidents, open defects and live possessions so the next controller starts informed.

Reads
Control logs, Maximo, possession planner
Gate
Outgoing controller signs

Governance

Every agent answers to your Command Center.

Agents prepare and propose. Your people approve at the gates you set, and the whole system runs inside your own perimeter.

  • Approval gates

    You decide which actions need a human sign-off, and who gives it.

  • Audit trail

    Each action is logged with the record it read and the rule it applied.

  • Rollback

    Reverse an agent action from the Command Center when a reviewer disagrees.

  • Kill switch

    Stop one agent or every agent at once, from one screen.

Questions

What your team will ask us first.

Ask us directly
Our delay attribution is contractually sensitive. Who decides?

Your performance team. Agents propose cause and responsibility with evidence, and attribution is shared only after a person agrees it.

Does this connect to signalling or train control?

No. Signalling, ETCS and train control are out of scope. Agents read the business and maintenance records your teams already use.

We share the network with other operators. Whose infrastructure does it run on?

Yours. Each organization runs its own deployment inside its own perimeter, and data shared with other operators follows the arrangements you already have.

We run passenger services and heavy freight. One model or two?

One Agent Twin with separate service patterns. Recon maps each traffic type on its own, so freight and passenger performance stop averaging together.

Bring us your delay backlog.Recon will map the rest.

Thirty minutes with our team. We will show you which rail queues agents take first and what Recon reads from Maximo and your planners.