Possession conflicts found late
Overlapping access requests and missing protections surface late in the planning cycle, when the only fix left is to cancel the work.
IndustriesRail and metro
Possessions, exam cycles and delay minutes are managed across Maximo, planning tools and spreadsheets. 009 agents keep each queue current.
Your systems
Backlog
Your network runs on a plan that changes every hour. The records behind it fall behind, and these are the queues where it shows.
Overlapping access requests and missing protections surface late in the planning cycle, when the only fix left is to cancel the work.
Incidents wait for attribution while minutes pile up, and every miscoded delay becomes an argument under the performance regime.
Fleet exams slip when depot plans and rolling stock diagrams change, and units run close to their exam limit.
Defect reports from drivers and depots arrive in free text, so their priority depends on who happens to read them first.
One workflow
A train runs late after a signal failure. The Delay Attribution Agent prepares the incident before your performance team agrees the cause.
The performance system logs delay minutes against a service and location.
Performance systemThe agent reads the asset fault log, control log entries and any open possession on the section.
MaximoIt proposes a cause code and responsible party, with the evidence and contract clause attached.
AttributionYour performance team confirms or changes the attribution before it goes to other operators.
Approval gateThe decision and its evidence are stored, so any later dispute starts from the same file.
Audit trailAgent roster
Agents work the planning and maintenance records around your railway. Signalling and train control stay out of scope.
Browse all agent typesChecks each possession request against overlapping work, protection arrangements and the timetable, and flags conflicts early.
Proposes cause and responsibility for each delay incident with evidence from asset, control and possession records.
Schedules fleet exams against mileage or time limits, depot capacity and the current diagram.
Projects units available per day from open defects, exams and parts status, so diagrams can be covered.
Reads free-text defect reports, assigns codes and priority, and raises the work order with the right depot.
Builds the shift handover from incidents, open defects and live possessions so the next controller starts informed.
Governance
Agents prepare and propose. Your people approve at the gates you set, and the whole system runs inside your own perimeter.
You decide which actions need a human sign-off, and who gives it.
Each action is logged with the record it read and the rule it applied.
Reverse an agent action from the Command Center when a reviewer disagrees.
Stop one agent or every agent at once, from one screen.
Your performance team. Agents propose cause and responsibility with evidence, and attribution is shared only after a person agrees it.
No. Signalling, ETCS and train control are out of scope. Agents read the business and maintenance records your teams already use.
Yours. Each organization runs its own deployment inside its own perimeter, and data shared with other operators follows the arrangements you already have.
One Agent Twin with separate service patterns. Recon maps each traffic type on its own, so freight and passenger performance stop averaging together.
Thirty minutes with our team. We will show you which rail queues agents take first and what Recon reads from Maximo and your planners.